
NAVIGATION
Road, Highway & Bridge

SOUTH-KLANG VALLEY EXPRESSWAY - INTERCHANGE AT IOI PALM GARDEN RESORT/MARRIOT HOTEL, PUTRAJAYA
IOI Corporation Berhad
Scope of Consultancy Services: Single Span 25m Bridge, alignment and Infrastructures Design Services for an Interchange off SKVE to IOI Palm Garden Resort near Putrajaya.
(Constrained by closely spaced junctions of the Serdang Hospital and the IOI Resort and requirement of structural protection over existing 900mm commissioned water mains)

ROAD UPGRADING: ALOR GAJAH TO MUAR (PACKAGE 1 ALOR GAJAH –LENDU, MELAKA)
THTechnologies-HCM JV
Scope of Consultancy Services: Road Alignment, Junction Design Earthworks and Drainage, Motorcycle/Pedestrian Crossing for All Packages.
To alleviate the Traffic Congestion along the Federal Road, the project is currently under construction by Design & Build Contractor THTechnologies-HCM JV for Jabatan Kerja Raya Malaysia.

PROJEK LEBUHRAYA PANTAI TIMUR FASA 2 – SEMPADAN PAHANG KE KUALA TERENGGANU (BRIDGE PACKAGES)
MTD Capital Berhad
Scope of Consultancy Services: Structural & Geotechnical Design for 12 nos of bridge packages (Road and River Crossings) along the 60 km Stretch of the Proposed East Coast Expressway Phase 2 including The Spur Road in Terengganu.

BRIDGE 1 OVER ERL, PRESINT 20 & BRIDGE 3 OVER ERL, PRECINT 5, PUTRAJAYA
Perbadanan Putrjaya
Scope of Consultancy Services: Alignment, Geotechnical, Structural and Local Utilities Design for a Bridge #1 over ERL Reserve, Presint 20 and Bridge #3 over ERL Reserve, Presint 5 For Perbadanan Putrajaya.

DIAMOND INTERCHANGE, BANDAR PUTERI KLANG
Malayapine Estates Sdn Bhd
Location: Bandar Puteri, Klang
Our Role: Design and supervision of full diamond Interchange on piled embankment with driven spun piles at centre piers on marine clay.

BRIDGE OVER ERL, PRESINT 7, PUTRAJAYA
Perbadanan Putrajaya
Scope of Consultancy Services: Full Civil & Structural Design of Bridge, Foundation, Traffic, Environmental, Electrical, Infrastructure and Landscape Consultancy Services for Perbadanan Putrajaya.
Bridge structures comprise an interchange of multi-span Precast Segmental Boxed Girder Bridge connecting existing B15 Interchange to Western Transport Terminal, Presint 7, Putrajaya.
PRIVATISATION OF WEST COAST HIGHWAY PROPOSAL: BANTING, SELANGOR - TG. PELEPAS, JOHOR
Terratech Consultant (M) Sdn Bhd
Scope of Consultancy Services: Technical and Financial Proposal for the Proposed Privatisation of The Southern Section of the West coast Highway.
PROJEK SIMPANG PULAI-LOGING-GUA MUSANG-KUALA BERANG (PACKAGE 5: CHIKU TO ARING, KELANTAN)
THT- HCM JV Sdn Bhd
Scope of Consultancy Services: Road Alignment, Junction Design Earthworks and Land Acquisition Design. Total length of 25.6 km, Package 1: From Kg Chiku to Sg. Aring.

Address:
9, Jalan Kenari 2,
Bandar Puchong Jaya,
47100 Puchong,
Selangor Darul Ehsan.
Contact:
Tel : +603 5882 7913
Fax : +603 5882 7631
Email: general@primareka.com